Foundation acceptance: the steps only Charles can do #99

Closed
opened 2026-11-11 13:55:33 +00:00 by charles · 2 comments
Owner

The acceptance pass (Task 26, #26) ticked what an agent can verify without credentials, a Windows desktop or merge rights. The record is docs/acceptance/2026-11-foundation.md; each line below names the criterion of the Foundation spec §9 it completes. Please tick them there (or comment here) once done.

  1. Merge the stack into foundation (PRs labelled ready-to-merge), then foundation into main. Criterion 10 asks for CI green on both runners from main; main holds no code yet. Attach the two run links.
  2. Dispatch the release once release.yaml is on the default branch (it was never run): tools/fj.sh POST /repos/charles/fluxer-native/actions/workflows/release.yaml/dispatches '{"ref":"main","inputs":{"version":"2026.1111.0"}}'. Check that the release native-2026.1111.0 has the AppImage, the exe and SHA256SUMS (criterion 10).
  3. Linux AppImage against fluxer.forked.io with your account (criteria 1, 3, 5, 6, 7): log in with password + TOTP; quit and relaunch (main screen without a login, token in KWallet under service fluxer-native); from another client send, edit and delete a message and type; mention yourself from another account with the window unfocused (notification, click selects the channel); send plain text; pull the network cable for 30 s (resume, no state loss).
  4. Windows exe (criteria 6, 10): same login and mention test; does the toast appear, does the app start at all on a machine with a GPU (the runner has no opengl32.dll, #93)?
  5. Side-by-side screenshots (criterion 2): Electron captures of login, main (#general) and settings at 1280x720 as described in docs/screenshots/README.md, next to fixtures/golden/*.png. Electron images of the live instance are not committed; attach them to PR of Task 26.
  6. Decide: is the machine the timings were taken on (Ryzen 9 9950X, CachyOS) the "reference workstation" of criterion 10?
The acceptance pass (Task 26, #26) ticked what an agent can verify without credentials, a Windows desktop or merge rights. The record is `docs/acceptance/2026-11-foundation.md`; each line below names the criterion of the Foundation spec §9 it completes. Please tick them there (or comment here) once done. 1. **Merge the stack** into `foundation` (PRs labelled `ready-to-merge`), then `foundation` into `main`. Criterion 10 asks for CI green on both runners **from `main`**; `main` holds no code yet. Attach the two run links. 2. **Dispatch the release** once `release.yaml` is on the default branch (it was never run): `tools/fj.sh POST /repos/charles/fluxer-native/actions/workflows/release.yaml/dispatches '{"ref":"main","inputs":{"version":"2026.1111.0"}}'`. Check that the release `native-2026.1111.0` has the AppImage, the exe and `SHA256SUMS` (criterion 10). 3. **Linux AppImage against fluxer.forked.io with your account** (criteria 1, 3, 5, 6, 7): log in with password + TOTP; quit and relaunch (main screen without a login, token in KWallet under service `fluxer-native`); from another client send, edit and delete a message and type; mention yourself from another account with the window unfocused (notification, click selects the channel); send plain text; pull the network cable for 30 s (resume, no state loss). 4. **Windows exe** (criteria 6, 10): same login and mention test; does the toast appear, does the app start at all on a machine with a GPU (the runner has no `opengl32.dll`, #93)? 5. **Side-by-side screenshots** (criterion 2): Electron captures of login, main (#general) and settings at 1280x720 as described in `docs/screenshots/README.md`, next to `fixtures/golden/*.png`. Electron images of the live instance are not committed; attach them to PR of Task 26. 6. **Decide**: is the machine the timings were taken on (Ryzen 9 9950X, CachyOS) the "reference workstation" of criterion 10?
charles added this to the Foundation milestone 2026-11-11 13:55:33 +00:00
Author
Owner

Accepted.

Accepted.
Author
Owner

No longer applies: Charles commented "Accepted"

Closed during the 2026-11-14 issue triage.

🤖 Generated with Claude Code

No longer applies: Charles commented "Accepted" Closed during the 2026-11-14 issue triage. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
charles/fluxer-native#99
No description provided.